OILY WASTE WATER SEPORATOR FACILITY ROOF

Client: U.S. Navy

Location: Naval Station Everett

Contract Value: $199,197

Completed: May 2008

This project involved design and construction of a new structural steel frame and AEP Span metal roof system to extend the existing facility roof an additional 1,000 sf to cover the oily waste treatment sumps and pumps. The facility had to remain operational during the roof installation to service ships in port. NCS performed the project management, quality control, safety, general conditions, demolition, concrete and concrete patching and oversaw the design coordination between the designer of record and the steel fabricator.