MUCK CREEK SANITARY SEWER PUMP STATION

Client: Nisqually Indian Tribe

Location: Olympia, WA

Contract Value: $1 Million

Completed: November 2013

NCS completed this design-build pump station which receives sewage from the Nisqually Red Wind Casino. A force main, approximately 4,200 feet long, conveys the sewage from the Muck Creek Pump Station to the temporary treatment facility.

Additionally, the pump station consists of 8-inch diameter gravity sewer, 4-foot diameter manholes, 6-inch diameter force main, submersible wastewater duplex pump station, valve vault, flow meter vault, pig port / bypass vault, odor control unit, emergency generator and associated site work.

The completed pump station.